March 2012
Historic Zoning Commission
Meeting Information

Below is the monthly archive for the March 2012 Historic Zoning Commission meeting, including the agenda, meeting minutes, and the recording of the meeting.

Agenda Minutes

Actions from the March 2012, meeting

2-B-12-HZ Approved as Modified

APPROVAL except replace all windows with sim divided light 2/2 unless not found to not be feasible; then replace at least 2nd-level front-and east-facing 2/2 windows (4) with 2/2 sim divided light windows with shadow bar. Shingle and fascia board in gable and installing additional sidelight at front door DENIED WITHOUT PREJUDICE until further documentation can be brought forward.



2-I-12-HZ Approved

2-J-12-HZ Approved


3-A-12-HZ Approved

3-B-12-HZ Approved

3-C-12-HZ Approved

Remnants of chimney stack to remain in tact until it can be repaired; however, opening should be temporarily covered to keep out moisture.


3-D-12-HZ Approved

repair brick and mortar according to Sec'y of Interiors Standards


3-E-12-HZ Approved as Modified

Proposal to add "abacus" to front porch column capital in #2 above denied without prejudice so that further research on modification can be provided at future date if desired. All other work approved with condition to utilize simulated divided-light windows (with muntin on both interior and exterior) on rear sunporch and for rear- added window.


3-F-12-HZ Approved

3-G-12-HZ Approved

3-H-12-HZ Approved

3-I-12-HZ Approved as Modified

APPROVAL to install two new lower-pitched square awnings (suspended by cable), and remove central awning. Locate Mkt Sq.-side entry doors one bay north. Install gooseneck lighting over signband. Add "Tupleo Honey"sign as inidicated on drawing.