September 2019
Historic Zoning Commission
Meeting Information

Below is the monthly archive for the September 2019 Historic Zoning Commission meeting, including the agenda, meeting minutes, and the recording of the meeting.

Agenda Minutes

Actions from the September 2019, meeting

10-C-19-HZ Approved

9-A-19-HZ Approved

9-B-19-HZ Approved as Modified

9-C-19-HZ Approved

9-E-19-HZ Approved

9-F-19-HZ Approved

9-G-19-HZ Approved

9-H-19-HZ Approved as Modified

- Installation of an HVAC system to the rear left corner of the house (north elevation). HVAC will be approximately 29-1/8" tall by 33" wide by 59" long. Unit will be minimally visible from the street. HVAC unit to be screened by shrubbery or fencing.

- Replacement of porch columns, balustrade, and flooring as necessary. Substantial deterioration is evident, and existing wood columns are not connected to foundation beams at the front of the house, therefore not providing sufficient support for the porch roof. Columns will be replaced with materials and design to match existing.

- Installation of access doors to basement/crawl space. Doors to be located toward rear of south elevation. Doors will be 45" wide by 60" long and elevated approximately 32" off the ground at their highest point. Doors will be wood double doors.

- Investigatory demolition of aluminum siding to determine conditions of siding underneath. Revised COA to be issued pending discovery of siding conditions.

- A revised COA to be issued pending design of right-side porch steps and associated guard and handrail.


9-I-19-HZ Denied (Withdrawn)

9-J-19-HZ Approved