12-A-18-HZ Approved with Conditions

Remove all or portions of the existing rear deck. Construct new wooden steps and handrail to meet the Building Code. New deck to be ~6'-6" deep x ~24' long.
It will be recessed from the east end of the house (next to the alley) by ~15" to 18"
The deck flooring will be treated wood decking of approximately 5- 1/2 inches wide
The pickets will be 2x2 nominally-sized square pickets and the handrail will be at 36 inches high. The pickets will either be set into the top and bottom rails or will be sandwiched in between 1x4s on the inside and outside of the pickets to obscure the ends. The handrails added to the newlly constructed swood steps will match that of the deck.
The deck will be supported by 6x6 square treated wood posts.
As a condition of approval, the area underneath the deck will be screened with wood or composite lattice panels as approved by staff.


12-B-18-HZ Approved

12-C-18-HZ Approved as Modified

-Repointing existing masonry as required
-Cleaning of existing masonry according to National Park Service Technical Brief
-New membrane roof (not visible)
-New gutters on upper roof and downspouts as required.
-Repair of existing steel windows. The windows will be repaired and reglazed where required with single pane clear glass to match existing conditions. The frames will be prepped, primed and repainted.


12-D-18-HZ Approved