Subdivision

Concept Plan

8-SD-05-C

Recommended for approval
by the Planning Commission

APPROVE variances 1 - 3 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 8 conditions


See case notes below

Details

Request

Property Info

Case Notes

What's next?

Details of Action

+
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
4. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation.
5. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions at the two entrances along Pine Grove Rd.
6. Placing a note on the final plat that all lots will have access only to the internal street system.
7. Meeting all requirements of the approved use on review development plan.
8. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.

Applicant Request

+
Subdivision
Pine Grove (Revised)
Lots
73 (Split)
Proposed Density
3.04 du/ac

Variances

1. Vertical curve variance on Swan Pond Lane at station 4+50 from 311? to 200?.
2. Vertical curve variance on Swan Pond Lane at station 7+88.9 from 496? to 396.75?.
3. Vertical curve variance on Quiet Brook Lane at station 6+42 from 420.25? to 336.19?.


Property Information

+
Location
South side of Pine Grove Rd., west of Strawberry Plains Pike.

Commission District 8


Size
24 acres

Sector
East County

Currently on the Property
Vacant land

Growth Plan
Urban Growth Area (Outside City Limits)

Case Notes

+
Staff Recommendation
APPROVE variances 1 - 3 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 8 conditions

1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
4. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation.
5. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions at the two entrances along Pine Grove Rd.
6. Placing a note on the final plat that all lots will have access only to the internal street system.
7. Meeting all requirements of the approved use on review development plan.
8. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Disposition Summary
APPROVE variances 1 - 3 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 8 conditions

Details of Action
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
4. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation.
5. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions at the two entrances along Pine Grove Rd.
6. Placing a note on the final plat that all lots will have access only to the internal street system.
7. Meeting all requirements of the approved use on review development plan.
8. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.

What's next?

+
After the Planning CommissionAppeals of Concept Plans and Final Plats are filed with Chancery CourtThe Process
Applicant

Pine Grove (Revised)

Eagle Bend Realty


Case History