1. Meeting all applicable requirements of the Knoxville Zoning Ordinance
2. Relocating the existing drainage easement that is located where the new addition is planned
3. Recording a plat that combines the 2 former parcels (119KA011 & 014)
4. Relocating the flag poles on the front of the site if they are found to be in the public right-of-way
5. Meeting all applicable requirements as required by the Zoning Ordinance for parking or obtaining any variances in the future
6. Relocate the dumpster to a location that will not require the garbage truck to back into the public right of way
7. Meeting all applicable requirements of the Knoxville Engineering Dept.
8. Provide parking during the construction of phase by leasing spaces from adjoiners or construction of the new parking facilities before removing old parking spaces
9. Meeting all applicable requirements of the Knoxville Fire Marshall
10. Meeting all applicable requirements of the Knox County Health Dept.
11. Providing plans for any additional proposed sign(s) to MPC staff for review and approval
12. Obtaining and maintaining all required operating licenses from the State of Tennessee Dept. of Health to conduct business as an assisted living facility
13. Meeting all requirements of the City of Knoxville Arborist and Installing all landscaping as shown on the plan within six months of obtaining an occupancy permit
With the conditions noted, this plan meets the requirements for approval in the O-1 district and the other criteria for approval of a use-on-review
Property Information
−
+
Location214 Prosperity Dr
East side of Prosperity Dr., east end of Executive Park Dr.
Council District 2
Census Tract 46.10
Size1.57 acres
SectorLand Use Designation? Office
Currently on the Property
Assisted living
Growth PlanUrban Growth Area (Inside City Limits)
- Utilities
SewerKnoxville Utilities Board
WaterKnoxville Utilities Board
Case Notes
−
+
Staff Recommendation
APPROVE the revised request for an assisted living facility with up to 99 client beds as shown on the site plan subject to the following 13 conditions
1. Meeting all applicable requirements of the Knoxville Zoning Ordinance
2. Relocating the existing drainage easement that is located where the new addition is planned
3. Recording a plat that combines the 2 former parcels (119KA011 & 014)
4. Relocating the flag poles on the front of the site if they are found to be in the public right-of-way
5. Meeting all applicable requirements as required by the Zoning Ordinance for parking or obtaining any variances in the future
6. Relocate the dumpster to a location that will not require the garbage truck to back into the public right of way
7. Meeting all applicable requirements of the Knoxville Engineering Dept.
8. Provide parking during the construction of phase by leasing spaces from adjoiners or construction of the new parking facilities before removing old parking spaces
9. Meeting all applicable requirements of the Knoxville Fire Marshall
10. Meeting all applicable requirements of the Knox County Health Dept.
11. Providing plans for any additional proposed sign(s) to MPC staff for review and approval
12. Obtaining and maintaining all required operating licenses from the State of Tennessee Dept. of Health to conduct business as an assisted living facility
13. Meeting all requirements of the City of Knoxville Arborist and Installing all landscaping as shown on the plan within six months of obtaining an occupancy permit
With the conditions noted, this plan meets the requirements for approval in the O-1 district and the other criteria for approval of a use-on-review
Disposition Summary
APPROVE the revised request for an assisted living facility with up to 99 client beds as shown on the site plan subject to the following 13 conditions
Details of Action
1. Meeting all applicable requirements of the Knoxville Zoning Ordinance
2. Relocating the existing drainage easement that is located where the new addition is planned
3. Recording a plat that combines the 2 former parcels (119KA011 & 014)
4. Relocating the flag poles on the front of the site if they are found to be in the public right-of-way
5. Meeting all applicable requirements as required by the Zoning Ordinance for parking or obtaining any variances in the future
6. Relocate the dumpster to a location that will not require the garbage truck to back into the public right of way
7. Meeting all applicable requirements of the Knoxville Engineering Dept.
8. Provide parking during the construction of phase by leasing spaces from adjoiners or construction of the new parking facilities before removing old parking spaces
9. Meeting all applicable requirements of the Knoxville Fire Marshall
10. Meeting all applicable requirements of the Knox County Health Dept.
11. Providing plans for any additional proposed sign(s) to MPC staff for review and approval
12. Obtaining and maintaining all required operating licenses from the State of Tennessee Dept. of Health to conduct business as an assisted living facility
13. Meeting all requirements of the City of Knoxville Arborist and Installing all landscaping as shown on the plan within six months of obtaining an occupancy permit