APPROVE the development plan for the proposed shopping center, with a total building area of 31,000 square feet in the SC (Shopping Center) zoning district, subject to the following 17 conditions:


See case notes below

Details

Request

Property Info

Case Notes

What's next?

Details of Action

+
1. Meeting all applicable requirements of the Knox County Zoning Ordinance.
2. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
3. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
4. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
5. Installing landscaping as shown on the landscape plan within six months of the issuance of occupancy permits for this project, or posting a bond in an amount acceptable to the Knox County Department of Engineering and Public Works to guarantee such installation.
6. Installing canopy trees within the proposed landscaped islands (see attached Tree Species Recommendation Matrix as per the Tree Conservation and Planting Plan).
7. Receiving a driveway entrance permit from the Tennessee Department of Transportation (TDOT).
8. Providing a cross access easement to the Legacy Park Foundation property as shown on the development plan.
9. Adherence to conditions outlined in the Traffic Impact Study conducted by Wilbur Smith & Assoc. in July of 2008.
10. Obtaining all necessary variances from the Knox County Board of Zoning Appeals.
11. Conducting a geotechnical study on the on-site depression prior to issuance of a grading permit from the Knox County Dept. of Engineering & Public Works.
12. Meeting all other applicable requirements of TDEC regarding the wetland area along with the previously approved Flood Study.
13. Submitting a road profile for the access into the park property in order to determine feasibility based on existing grade restrictions.
14. Providing a 1,100? greenway easement connection to the future Halls Greenway.
15. Meeting all applicable requirements of the Knox County Fire Marshall.
16. Proposed signage will be required to meet all applicable requirements of the Knox County Zoning Ordinance (Art.3.90.09, H).
17. Submitting a revised development plan to MPC staff for review and approval, reflecting the conditions of approval of this plan prior to any grading permits for this site.

With the conditions noted, this plan meets the requirements for approval of a use-on-review in the SC zoning district.

Applicant Request

+

Property Information

+
Location
South side of Norris Frwy., west of Maynardville Pike

Commission District 7
Census Tract 62.04


Size
12 acres

Sector
North County

Land Use Designation? C, STPA, LDR


Currently on the Property
Vacant

Growth Plan
Planned Growth Area

Case Notes

+
Staff Recommendation
APPROVE the development plan for the proposed shopping center, with a total building area of 31,000 square feet in the SC (Shopping Center) zoning district, subject to the following 17 conditions:
1. Meeting all applicable requirements of the Knox County Zoning Ordinance.
2. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
3. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
4. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
5. Installing landscaping as shown on the landscape plan within six months of the issuance of occupancy permits for this project, or posting a bond in an amount acceptable to the Knox County Department of Engineering and Public Works to guarantee such installation.
6. Installing canopy trees within the proposed landscaped islands (see attached Tree Species Recommendation Matrix as per the Tree Conservation and Planting Plan).
7. Receiving a driveway entrance permit from the Tennessee Department of Transportation (TDOT).
8. Providing a cross access easement to the Legacy Park Foundation property as shown on the development plan.
9. Adherence to conditions outlined in the Traffic Impact Study conducted by Wilbur Smith & Assoc. in July of 2008.
10. Obtaining all necessary variances from the Knox County Board of Zoning Appeals.
11. Conducting a geotechnical study on the on-site depression prior to issuance of a grading permit from the Knox County Dept. of Engineering & Public Works.
12. Meeting all other applicable requirements of TDEC regarding the wetland area along with the previously approved Flood Study.
13. Submitting a road profile for the access into the park property in order to determine feasibility based on existing grade restrictions.
14. Providing a 1,100? greenway easement connection to the future Halls Greenway.
15. Meeting all applicable requirements of the Knox County Fire Marshall.
16. Proposed signage will be required to meet all applicable requirements of the Knox County Zoning Ordinance (Art.3.90.09, H).
17. Submitting a revised development plan to MPC staff for review and approval, reflecting the conditions of approval of this plan prior to any grading permits for this site.

With the conditions noted, this plan meets the requirements for approval of a use-on-review in the SC zoning district.
Disposition Summary
APPROVE the development plan for the proposed shopping center, with a total building area of 31,000 square feet in the SC (Shopping Center) zoning district, subject to the following 17 conditions:
Details of Action
1. Meeting all applicable requirements of the Knox County Zoning Ordinance.
2. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
3. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
4. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
5. Installing landscaping as shown on the landscape plan within six months of the issuance of occupancy permits for this project, or posting a bond in an amount acceptable to the Knox County Department of Engineering and Public Works to guarantee such installation.
6. Installing canopy trees within the proposed landscaped islands (see attached Tree Species Recommendation Matrix as per the Tree Conservation and Planting Plan).
7. Receiving a driveway entrance permit from the Tennessee Department of Transportation (TDOT).
8. Providing a cross access easement to the Legacy Park Foundation property as shown on the development plan.
9. Adherence to conditions outlined in the Traffic Impact Study conducted by Wilbur Smith & Assoc. in July of 2008.
10. Obtaining all necessary variances from the Knox County Board of Zoning Appeals.
11. Conducting a geotechnical study on the on-site depression prior to issuance of a grading permit from the Knox County Dept. of Engineering & Public Works.
12. Meeting all other applicable requirements of TDEC regarding the wetland area along with the previously approved Flood Study.
13. Submitting a road profile for the access into the park property in order to determine feasibility based on existing grade restrictions.
14. Providing a 1,100? greenway easement connection to the future Halls Greenway.
15. Meeting all applicable requirements of the Knox County Fire Marshall.
16. Proposed signage will be required to meet all applicable requirements of the Knox County Zoning Ordinance (Art.3.90.09, H).
17. Submitting a revised development plan to MPC staff for review and approval, reflecting the conditions of approval of this plan prior to any grading permits for this site.

With the conditions noted, this plan meets the requirements for approval of a use-on-review in the SC zoning district.

What's next?

+
As a Use On Review case, the Planning Commission's decision is final, and it will not be heard by a legislative body unless it is appealed.

The appeal deadline - September 13, 2008 - has passed.

The Process
Applicant

441 Partnership


Case History