Subdivision

Concept Plan

6-SE-08-C

Recommended for approval
by the Planning Commission

APPROVE the Concept Plan subject to 14 conditions


See case notes below

Details

Request

Property Info

Case Notes

What's next?

Details of Action

+
1. Meeting all applicable requirements of the Knox County Dept. of Engineering and Public Works
2. Prior to obtaining a grading permit, provide 450' of sight distance and establish a sight distance easement at the intersection of the proposed joint permanent easement with S. Northshore Dr.
3. Construction of an acceptable type of turnaround at the end of the joint permanent easement as required by the Knox County Dept. of Engineering and Public Works
4. Provision of a 50' buffer/setback from the highest hachured contour of the two sinkholes along the eastern boundary of the site
5. Provision of water quality basisn(s) as may be required by the Knox County Dept. of Engineering and Public Works
6. Call out the required 25' property line and pavement radius at the intersection of the proposed joint permanent easement and S. Northshore Dr.
7. Meeting all applicable requirements and obtaining all required permits from the Tennessee Valley Authority
8. Provision of a name for the joint permanent easement which is consistent with the Uniform Street Naming and Addressing System within Knox County.
9. Prior to final plat recording establish a homeowners association for the purpose of owning and maintaining the joint permanent easement, commonly held open space, the drainage facilities and any other commonly held assets
10. Connection to sanitary sewer and meeting any other applicable requirement of the Knox County Health Dept.
11. Obtaining a street connection permit from the Tennessee Dept, of Transportation
12. Placing a note on the final plat that all lots will have access from the joint permanent easement only
13. Approval of the rezoning of this site to PR (Planned Residential) by the Knox County Commission at a density that will permit the proposed development
14. A final plat application based on this concept plan will not be accepted for review by the MPC until a certification of design plan has been submitted to the MPC staff

Applicant Request

+
Subdivision
Stoney Point Farm
Lots
9 (Split)
Proposed Density
1.99 du/ac
Residential?
Yes - SF

Variances

None


Property Information

+
Location
South side of S. Northshore Dr., southwest of Nolina Rd.

Commission District 5


Size
4.54 acres

Sector
Southwest County

Currently on the Property
1 dwelling and vacant land

Growth Plan
Planned Growth Area

Case Notes

+
Staff Recommendation
APPROVE the Concept Plan subject to 14 conditions
1. Meeting all applicable requirements of the Knox County Dept. of Engineering and Public Works
2. Prior to obtaining a grading permit, provide 450' of sight distance and establish a sight distance easement at the intersection of the proposed joint permanent easement with S. Northshore Dr.
3. Construction of an acceptable type of turnaround at the end of the joint permanent easement as required by the Knox County Dept. of Engineering and Public Works
4. Provision of a 50' buffer/setback from the highest hachured contour of the two sinkholes along the eastern boundary of the site
5. Provision of water quality basisn(s) as may be required by the Knox County Dept. of Engineering and Public Works
6. Call out the required 25' property line and pavement radius at the intersection of the proposed joint permanent easement and S. Northshore Dr.
7. Meeting all applicable requirements and obtaining all required permits from the Tennessee Valley Authority
8. Provision of a name for the joint permanent easement which is consistent with the Uniform Street Naming and Addressing System within Knox County.
9. Prior to final plat recording establish a homeowners association for the purpose of owning and maintaining the joint permanent easement, commonly held open space, the drainage facilities and any other commonly held assets
10. Connection to sanitary sewer and meeting any other applicable requirement of the Knox County Health Dept.
11. Obtaining a street connection permit from the Tennessee Dept, of Transportation
12. Placing a note on the final plat that all lots will have access from the joint permanent easement only
13. Approval of the rezoning of this site to PR (Planned Residential) by the Knox County Commission at a density that will permit the proposed development
14. A final plat application based on this concept plan will not be accepted for review by the MPC until a certification of design plan has been submitted to the MPC staff
Disposition Summary
APPROVE the Concept Plan subject to 14 conditions
Details of Action
1. Meeting all applicable requirements of the Knox County Dept. of Engineering and Public Works
2. Prior to obtaining a grading permit, provide 450' of sight distance and establish a sight distance easement at the intersection of the proposed joint permanent easement with S. Northshore Dr.
3. Construction of an acceptable type of turnaround at the end of the joint permanent easement as required by the Knox County Dept. of Engineering and Public Works
4. Provision of a 50' buffer/setback from the highest hachured contour of the two sinkholes along the eastern boundary of the site
5. Provision of water quality basisn(s) as may be required by the Knox County Dept. of Engineering and Public Works
6. Call out the required 25' property line and pavement radius at the intersection of the proposed joint permanent easement and S. Northshore Dr.
7. Meeting all applicable requirements and obtaining all required permits from the Tennessee Valley Authority
8. Provision of a name for the joint permanent easement which is consistent with the Uniform Street Naming and Addressing System within Knox County.
9. Prior to final plat recording establish a homeowners association for the purpose of owning and maintaining the joint permanent easement, commonly held open space, the drainage facilities and any other commonly held assets
10. Connection to sanitary sewer and meeting any other applicable requirement of the Knox County Health Dept.
11. Obtaining a street connection permit from the Tennessee Dept, of Transportation
12. Placing a note on the final plat that all lots will have access from the joint permanent easement only
13. Approval of the rezoning of this site to PR (Planned Residential) by the Knox County Commission at a density that will permit the proposed development
14. A final plat application based on this concept plan will not be accepted for review by the MPC until a certification of design plan has been submitted to the MPC staff

What's next?

+
After the Planning Commission
Because of its location in the County, appeals will be heard by Knox County Chancery Court.
Appeals of Concept Plans and Final Plats are filed with Chancery CourtThe Process
Applicant

Stoney Point Farm

Stoney Point Farm, LLC


Case History