Property Information
−
+
LocationNorthwest side of Millertown Pk., southwest side of Loves Creek Rd.
Council District 4
Size10.50 acres
Sector
Currently on the Property
Vacant land
Growth PlanUrban Growth Area (Inside City Limits)
- Utilities
ElectricityKnoxville Utilities Board
Natuarl GasKnoxville Utilities Board
SewerKnoxville Utilities Board
TelephoneAT&T
WaterKnoxville Utilities Board
Case Notes
−
+
Staff Recommendation
APPROVE the concept plan subject to 16 conditions
1. Meeting all applicable requirements of the Knoxville Zoning Ordinance
2. Meeting all applicable requirements of the Knoxville Dept. of Engineering
3. Obtaining a "letter of floodplain revision" from FEMA prior to commencing grading on this site
4. Meeting all applicable requirements and obtaining all required permits from the Tenn. Dept. of Environment and Conservation and the U.S. Army Corp of Engineers
5. Provision of the stream buffer as required by the Knoxville Engineering Dept.
6. Improving the Vertical curve at the entrance to the development on Road B at Millertown Pk. per the requirements of the Knoxville Engineering Dept.
7. Installation of the left turn lane as called for in the traffic impact study prior to obtaining building permits for proposed lots 8 or 9
8. As tenants/ buyers are identified, obtain approval of a development plan for each lot through the use on review process. Building setbacks are determined through the use on review process
9. All proposed direct access to Millertown Pk. being limited to right turn in and right turn out only
10. Prior to final plat approval provide verification of participation in the KUB sewer capacity reservation program
11. Connection to sanitary sewer and meeting all other applicable requirements of the Knox County Health Dept.
12. Provision of street names which are consistent with the Uniform Street Naming and Addressing Ordinance within Knoxville
13. Provision of written documentation from Knoville Center Mall ( Simmon Co.) agreeing to the proposed access to Kinzel Wy.
14. Provision of the required right-of-way surrounding the turn-around at the end of Road B
15. Prior to final plat approval, establish a property owners association for the purpose of maintaining all storm drainage improvements and any other commonly held assets
16. A final plat based on this concept plan will not be accepted for review by MPC until certification of design plan approval has been submitted to MPC staff
Disposition Summary
APPROVE the concept plan subject to 16 conditions