Subdivision

Concept Plan

5-SL-04-C

Recommended for approval
by the Planning Commission

APPROVE variances 1 - 3 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 13 conditions:


See case notes below

Request

Property Info

Case Notes

What's next?

Applicant Request

+
Subdivision
Century Park at Pellissippi
Lots
19 (Split)

Variances

1. Intersection grade variance on Century Park Blvd. at Dutchtown Rd., from 1% to 2%.
2. Intersection grade variance on Road A at Century Park Blvd., from 1% to 1.5%.
3. Intersection grade variance on Road B at Century Park Blvd., from 1% to 1.5%.


Property Information

+
Location
South side of Dutchtown Rd., west side of Mabry Hood Rd., and east side of Sherrill Blvd.

Council District 2


Size
81.54 acres

Sector
Northwest County

Currently on the Property
Vacant land and office buiding under construction

Growth Plan
Urban Growth Area (Inside City Limits)

Case Notes

+
Staff Recommendation
APPROVE variances 1 - 3 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 13 conditions:

1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knoxville (City Ord. 0-280-90).
3. Installing a traffic signal at the intersection of Century Park Blvd. and Dutchtown Rd. at such time it is warranted by actual traffic volumes. In addition, an eastbound right turn lane should be installed at this intersection on Dutchtown Rd. as part of the County road improvements to Dutchtown Rd.
4. Installing an additional northbound left turn lane on Sherrill Blvd. at Dutchtown Rd.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works for improvements within the right-of-way of Dutchtown Rd.
6. Meeting all applicable requirements of the Knoxville Department of Engineering.
7. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation for any alteration and construction within the sinkholes.
8. If any building or roadway construction is proposed within the 50 buffer area around the designated sinkholes (including the sinkholes), a geotechnical report must be prepared by a registered engineer to determine soil stability and that report must submitted to the Knoxville Department of Engineering for consideration. Any construction in these areas is subject to approval by the City following review of the report. Engineered footings must be designed for these areas.
9. Approval of the access to Lot 1 from Mabry Hood Rd., is subject to approval by the Knoxville Department of Engineering after completion of the relocation improvements and turn lanes for Mabry Hood Rd.
10. Any landscaping within the Joint Permanent Easement (JPE) medians and at all intersections shall meet the visibility triangle requirements of the Knoxville Zoning Ordinance.
11. Prior to certification of the final plat for the subdivision, establishing a property owners association that will be responsible for maintenance of the joint permanent easements, drainage system and other commonly held property.
12. Meeting all applicable requirements of the Knoxville Zoning Ordinance.
13. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Disposition Summary
APPROVE variances 1 - 3 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 13 conditions:

What's next?

+
After the Planning CommissionAppeals of Concept Plans and Final Plats are filed with Chancery CourtThe Process
Applicant

Century Park at Pellissippi

Commercial & Investment Properties Co.


Case History