Subdivision

Concept Plan

5-SF-02-C

Recommended for approval
by the Planning Commission

APPROVE variances 1-5 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.
APPROVE the Concept Plan subject to 14 conditions:


See case notes below

Details

Request

Property Info

Case Notes

What's next?

Details of Action

+
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Prior to Design Plan approval, the applicant shall submit a revised run of the flood study model based on data from the cross sections for the road crossing and any other potential encroachments into the no fill zone. Based on the results, the applicant may be required to mitigate for the proposed fill and submit a revised Concept Plan for any revisions to the road and lot layout.
4. Conducting compaction testing in all fill areas associated with street construction per the requirements of the Knox County Department of Engineering and Public Works.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation.
7. Meeting all applicable requirements and obtaining all required approvals from the Tennessee Valley Authority for all development activity within the powerline easement.
8. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions along Wallace Rd.
9. Providing the required sight distance easements on the final plat for Lot 18 and along the Wallace Rd. frontage.
10. Place a note on the final plat that all lots except for Lots 1, 2 and 43 will have access only to the internal street system.
11. Place a note on the final plat that Lot 43 must have a turnaround driveway on the lot.
12. Identify the minimum floor elevations, floodway, 100 and 500 year flood fringe and a no-fill areas on the final plat.
13. Meeting all requirements of the approved use on review development plan.
14. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.

Applicant Request

+
Subdivision
Richmond Hill
Lots
48 (Split)
Proposed Density
2.82 du/ac

Variances

1. Intersection grade variance for Road A at Branton Blvd., from 1% to 3%.
2. Intersection grade variance for Road B at Wallace Rd, from 1% to 3%.
3. Vertical curve variance at station 0+85 on Road B, from 225' to 145'.
4. Horizontal curve variance at station 3+50 on Road B, from 250' to 175'.
5. Horizontal curve variance at station 9+50 on Road B, from 250' to 100'.


Property Information

+
Location
West side of Wallace Rd., east side of Branton Blvd., just north of S. Northshore Dr.

Commission District 4


Size
17 acres

Sector
Southwest County

Currently on the Property
Vacant land

Growth Plan
Planned Growth Area

Case Notes

+
Staff Recommendation
APPROVE variances 1-5 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 14 conditions:

1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Prior to Design Plan approval, the applicant shall submit a revised run of the flood study model based on data from the cross sections for the road crossing and any other potential encroachments into the no fill zone. Based on the results, the applicant may be required to mitigate for the proposed fill and submit a revised Concept Plan for any revisions to the road and lot layout.
4. Conducting compaction testing in all fill areas associated with street construction per the requirements of the Knox County Department of Engineering and Public Works.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation.
7. Meeting all applicable requirements and obtaining all required approvals from the Tennessee Valley Authority for all development activity within the powerline easement.
8. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions along Wallace Rd.
9. Providing the required sight distance easements on the final plat for Lot 18 and along the Wallace Rd. frontage.
10. Place a note on the final plat that all lots except for Lots 1, 2 and 43 will have access only to the internal street system.
11. Place a note on the final plat that Lot 43 must have a turnaround driveway on the lot.
12. Identify the minimum floor elevations, floodway, 100 and 500 year flood fringe and a no-fill areas on the final plat.
13. Meeting all requirements of the approved use on review development plan.
14. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Disposition Summary
APPROVE variances 1-5 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.
APPROVE the Concept Plan subject to 14 conditions:

Details of Action
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Prior to Design Plan approval, the applicant shall submit a revised run of the flood study model based on data from the cross sections for the road crossing and any other potential encroachments into the no fill zone. Based on the results, the applicant may be required to mitigate for the proposed fill and submit a revised Concept Plan for any revisions to the road and lot layout.
4. Conducting compaction testing in all fill areas associated with street construction per the requirements of the Knox County Department of Engineering and Public Works.
5. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
6. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation.
7. Meeting all applicable requirements and obtaining all required approvals from the Tennessee Valley Authority for all development activity within the powerline easement.
8. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions along Wallace Rd.
9. Providing the required sight distance easements on the final plat for Lot 18 and along the Wallace Rd. frontage.
10. Place a note on the final plat that all lots except for Lots 1, 2 and 43 will have access only to the internal street system.
11. Place a note on the final plat that Lot 43 must have a turnaround driveway on the lot.
12. Identify the minimum floor elevations, floodway, 100 and 500 year flood fringe and a no-fill areas on the final plat.
13. Meeting all requirements of the approved use on review development plan.
14. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.

What's next?

+
After the Planning CommissionAppeals of Concept Plans and Final Plats are filed with Chancery CourtThe Process
Applicant

Richmond Hill

Eagle Bend Properties, LLC


Case History