1. Meeting all applicable requirements of the Knoxville Zoning Ordinance.
2. Meeting all applicable requirements of the Knoxville Department of Engineering.
3. In addition to the "stealth" structural design of the proposed tower, there shall be no exterior antennas.
4. Since the FAA does not require any lighting for this facility, there shall be no lighting on the tower.
5. The perimeter of the fenced area shall be landscaped.
6. Installing the proposed landscaping as shown on the landscape plan within six months of the tower becoming operational.
7. At the time of the request for a building permit, posting a bond or other approved financial surety that would ensure the removal of the tower if it is abandoned.

Applicant Request

+

Property Information

+
Location
6242 Grove Dr

Northwest side of Grove Dr., southeast of Rifle Range Dr.

Council District 4
Census Tract 50


Size
6.49 acres

Sector
North City

Land Use Designation? LDR


Currently on the Property
Residences

Growth Plan
Urban Growth Area

Case Notes

+
Staff Recommendation
APPROVE the request for a 90' monopole telecommunications tower in the R-1 zoning district, subject to the following 7 conditions:
1. Meeting all applicable requirements of the Knoxville Zoning Ordinance.
2. Meeting all applicable requirements of the Knoxville Department of Engineering.
3. In addition to the "stealth" structural design of the proposed tower, there shall be no exterior antennas.
4. Since the FAA does not require any lighting for this facility, there shall be no lighting on the tower.
5. The perimeter of the fenced area shall be landscaped.
6. Installing the proposed landscaping as shown on the landscape plan within six months of the tower becoming operational.
7. At the time of the request for a building permit, posting a bond or other approved financial surety that would ensure the removal of the tower if it is abandoned.
Disposition Summary
APPROVE the request for a 90' monopole telecommunications tower in the R-1 zoning district, subject to the following 7 conditions:
Details of Action
1. Meeting all applicable requirements of the Knoxville Zoning Ordinance.
2. Meeting all applicable requirements of the Knoxville Department of Engineering.
3. In addition to the "stealth" structural design of the proposed tower, there shall be no exterior antennas.
4. Since the FAA does not require any lighting for this facility, there shall be no lighting on the tower.
5. The perimeter of the fenced area shall be landscaped.
6. Installing the proposed landscaping as shown on the landscape plan within six months of the tower becoming operational.
7. At the time of the request for a building permit, posting a bond or other approved financial surety that would ensure the removal of the tower if it is abandoned.

What's next?

+
As a Use On Review case, the Planning Commission's decision is final, and it will not be heard by a legislative body unless it is appealed.
After the Planning Commission
Because of its location in the City, appeals will be heard by Knoxville City Council.
Knoxville City Council
May 20, 2008
Appeal by: April 25, 2008
June 3, 2008
Appeal by: April 25, 2008

The appeal deadline - April 25, 2008 - has passed.