Subdivision

Concept Plan

3-SG-04-C

Recommended for approval
by the Planning Commission

APPROVE variances 1- 4 because the site's topography restricts compliance with the Subdivision Regulations.
APPROVE the concept plan subject to 12 conditions


See case notes below

Details

Request

Property Info

Case Notes

What's next?

Details of Action

+
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
3. Prior to commencing site grading for the subdivision, the applicant will widen Thompson Rd. from the southern boundary of parcel 141(the site) northward to Hardin Valley Rd. to minimum paved width of 20'.
4. Place a note on the final plat that all lots except 59 and 60 will have access via the internal street system only.
5. Provision of street names which are consistent with the Uniform Street Naming and Addressing System in Knox County, Ord. (91-1-102).
6.. Meeting all requirements of the approved Use-on-Review development plan.
7. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
8. Final approval of the rezoning of this site to Planned Residential at 1-3 du/ac (east side) and Planned Residential at 1-1.5 du/ac (west side).
9. Prior to design plan approval, review and approval of the grading plan for this site by the gas pipeline owners before any grading or other land disturbance begins on this site.
10. Place a note on the final plat that no building is to occur within 50' of the depressed area located on lot 33 unless a geotechnical study certifying the stability of the building sites is prepared by the applicant's engineer and approved by the Knox County Dept. of Engineering and Public Works.
11. Dedication of right-of-way on both sides of Thompson Rd. through this site to 30' either side of the existing center line.
12. Certification on the final plat by the applicant's engineer that there is 300' of sight distance in both directions at the entrance to the development and each proposed driveway location on Thompson Rd.

Applicant Request

+
Subdivision
The Woods at Hardin Valley
Lots
60 (Split)
Proposed Density
1.98 du/ac

Variances

1. Horizontal curve variance from 250' to 225' at sta. 5+00 of Road A.
2. Intersection grade variances from 1% to 3% at Road A and Thompson Rd., Road B at Road A and Road C at Road A.
3. Vertical curve variance from 250' to 200' at sta. 1+15 of Road A.
4. Road grade variance from 12% to 13% between sta. 1+15 and sta. 4+25 of Road A.


Property Information

+
Location
East and west sides of Thompson Rd. , south of Hardin Valley Rd.

Commission District 6


Size
30.30 acres

Sector
Northwest County

Currently on the Property
Vacant land

Growth Plan
Planned Growth Area

Case Notes

+
Staff Recommendation
APPROVE variances 1- 4 because the site's topography restricts compliance with the Subdivision Regulations.
APPROVE the concept plan subject to 12 conditions

1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
3. Prior to commencing site grading for the subdivision, the applicant will widen Thompson Rd. from the southern boundary of parcel 141(the site) northward to Hardin Valley Rd. to minimum paved width of 20'.
4. Place a note on the final plat that all lots except 59 and 60 will have access via the internal street system only.
5. Provision of street names which are consistent with the Uniform Street Naming and Addressing System in Knox County, Ord. (91-1-102).
6.. Meeting all requirements of the approved Use-on-Review development plan.
7. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
8. Final approval of the rezoning of this site to Planned Residential at 1-3 du/ac (east side) and Planned Residential at 1-1.5 du/ac (west side).
9. Prior to design plan approval, review and approval of the grading plan for this site by the gas pipeline owners before any grading or other land disturbance begins on this site.
10. Place a note on the final plat that no building is to occur within 50' of the depressed area located on lot 33 unless a geotechnical study certifying the stability of the building sites is prepared by the applicant's engineer and approved by the Knox County Dept. of Engineering and Public Works.
11. Dedication of right-of-way on both sides of Thompson Rd. through this site to 30' either side of the existing center line.
12. Certification on the final plat by the applicant's engineer that there is 300' of sight distance in both directions at the entrance to the development and each proposed driveway location on Thompson Rd.
Disposition Summary
APPROVE variances 1- 4 because the site's topography restricts compliance with the Subdivision Regulations.
APPROVE the concept plan subject to 12 conditions

Details of Action
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
3. Prior to commencing site grading for the subdivision, the applicant will widen Thompson Rd. from the southern boundary of parcel 141(the site) northward to Hardin Valley Rd. to minimum paved width of 20'.
4. Place a note on the final plat that all lots except 59 and 60 will have access via the internal street system only.
5. Provision of street names which are consistent with the Uniform Street Naming and Addressing System in Knox County, Ord. (91-1-102).
6.. Meeting all requirements of the approved Use-on-Review development plan.
7. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
8. Final approval of the rezoning of this site to Planned Residential at 1-3 du/ac (east side) and Planned Residential at 1-1.5 du/ac (west side).
9. Prior to design plan approval, review and approval of the grading plan for this site by the gas pipeline owners before any grading or other land disturbance begins on this site.
10. Place a note on the final plat that no building is to occur within 50' of the depressed area located on lot 33 unless a geotechnical study certifying the stability of the building sites is prepared by the applicant's engineer and approved by the Knox County Dept. of Engineering and Public Works.
11. Dedication of right-of-way on both sides of Thompson Rd. through this site to 30' either side of the existing center line.
12. Certification on the final plat by the applicant's engineer that there is 300' of sight distance in both directions at the entrance to the development and each proposed driveway location on Thompson Rd.

What's next?

+
After the Planning CommissionAppeals of Concept Plans and Final Plats are filed with Chancery CourtThe Process
Applicant

The Woods at Hardin Valley

S&E Properties


Case History