Recommended for approval
by the Planning Commission
Approve Variances 1-2
APPROVE Final Plat
Approve Variances 1-2
APPROVE Final Plat
1. To reduce the required utility and drainage easement within the Detention Basin Easement on all lots from 10' or 5' as required to 0'.
2. To reduce the required utility and drainage easement on Lot 1 under the existing shed from 10' to 0' as shown on plat.
Council District 3
Abbott Land Surveying