Staff Recommendation
APPROVE. Proposed work is consistent with adopted design guidelines and with Historic Zoning Commission review of October 17, 2002.
APPROVE. Proposed work is consistent with adopted design guidelines and with Historic Zoning Commission review of October 17, 2002.
Clean, repair and point brick as necessary; installed paired one over one double hung windows on second story respecting remaining outline of original windows; install new storefront with transoms and shop windows; install paired wood full view entry doors; install cornice at top of building.
McNulty Bulding. Two story brick building with double hung windows, prism glass transom. Corbelled cornice with limestone band and section of brick arches and front parapet, stone string course and sills with brick dentil molding. Altered storefront.
Commission is aske dto RATIFY Certificate No. 12203(#32)MKT.