Approve Variances 1-5
APPROVE FINAL PLAT
See case notes below
Approve Variances 1-5
APPROVE FINAL PLAT
1. Allow more than 5 lots (all existing) on a Joint Permanent Easement (JPE) in an Agricultural zone.
2. Waive the requirement for a turnaround on the JPE.
3. Reduce the required driving surface of the JPE from 22' to 10'
4. Waive the requirement for utility and drainage easements inside west and north exterior lot lines of lot 2 under the existng building.
5. Waive the requirement for a maintenance agreement for the JPE.