Staff Recommendation
APPROVE. Proposed work, although altered from original application, is still consisted with approved Edgewood-Park City Design Guidelines. Commission is being asked to ratify Certificate 110800EDG, issued November 8, 2000.
APPROVE. Proposed work, although altered from original application, is still consisted with approved Edgewood-Park City Design Guidelines. Commission is being asked to ratify Certificate 110800EDG, issued November 8, 2000.
Revised Certificate - Maintain porch columns as found; replace inappropriate balustrade with turned spindles. NOTE: THIS IS REVISED CERTIFICATE.
One story frame with asbestos shingle wall covering. Hip and gable roof with asphalt shingle covering, decorative wood shingles and sawn wood trim in gable. One story front and side wrap around porch pariclaly enclosed with turned wood posts and beaded wood spandrels, sawn wood brackets. Double hung one over one windows. Interior offset brick corbelled chimneys. Brick foundation. Irregular plan.
Applicant was unable to complete original ambitious scope of project, because condition of roof made extremely expensive repairs necessary, but hopes to revisit and complete exterior restoration in the future.