Staff Recommendation
APPROVE. Proposed work is consisted with adopted Fourth & Gill Design Guidelines.
APPROVE. Proposed work is consisted with adopted Fourth & Gill Design Guidelines.
Reroof; remove artificial siding and repair remaining wood siding/shingles in kind; restucco foundation as necessary using a soft mortar; restore original front door; add French doors to rear; remove storm windows and repair original wood windows, possibly replacing storm windows with color-clad storms; add wood double hung windows to kitchen on rear and rear/side elevations, not visible from Luttrell.
Two story frame with aluminum siding wall covering. Cross gable roof with aspahlt shingle roof covering. Two over two double hung windows. Concrete stoop. Interior offset brick chimney. Stuccoed foundation. Irregular plan. Dentil molding at entry door.
Commission is asked to RATIFY Certificate No. 1101024&G.