Details of Action
−
+
DENY the waiver from the Design Guidelines to increase the maximum light intensity limits for the parking lot lighting from 2.5 foot candles to the limits shown on the photometric plan. The maximum limit of 2.5 foot candles has been applied to all requests since the update of the Design Guidelines in 2011.
APPROVE the waiver from the Design Guidelines to allow an increase in intensity of lighting for the canopy for the drive-thru and ATM area in order to be in compliance with the ATM Act for 24-hour banking.
APPROVE the request for a Certificate of Appropriateness for a building permit, subject to the following conditions:
1) Revising the site lighting plan to meet the Design Guidelines lighting intensity standards based on the TTCDA Board's action on the lighting plan.
2) Vehicular access to the site is limited to access to the extension of Century Park Blvd. and a single access out to Sherrill Blvd.
3) Implementation by the developer (Pellissippi Dutchtown General Partnership) of any recommended improvements identified in the Traffic Impact Study prepared by Cannon & Cannon Inc., dated November 28, 2017 and as revised and approved by the City of Knoxville Department of Engineering, Knox County Department of Engineering and Public Works and Planning Commission staff. The improvements shall be installed to the standards and schedule as approved by the City of Knoxville Department of Engineering and Knox County Department of Engineering and Public Works.
4) Installing the sidewalks as identified on the Site Layout Plan meeting the requirements of the Knoxville Department of Engineering and the Americans with Disabilities Act (ADA) requirements. The Knoxville Department of Engineering may approve a 10' wide asphalt sidewalk or greenway in-lieu-of the 5' wide concrete sidewalk.
5) Working with the Knox County Parks Planning & Development Manager on the possible greenway route for the Knox to Oak Ridge Greenway through the Century Park Development.
6) Installing all landscaping as identified on the landscape plan within six months of the issuance of an occupancy permit for this project.
7) Meeting all applicable requirements of the Knoxville Department of Engineering.
8) Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
9) Meeting all applicable requirements of the Knoxville Zoning Ordinance.
Property Information
−
+
Location10209 Sherrill Blvd
South end of Century Park Blvd., northeast side of Sherrill Blvd., west side of Mabry Hood Rd.
Council District 2
Size23.65 acres
Sector
Currently on the Property
Vacant land
Case Notes
−
+
Staff Recommendation
Staff recommends DENIAL of the waiver from the Design Guidelines to increase the maximum light intensity limits for the parking lot lighting from 2.5 foot candles to the limits shown on the photometric plan. The maximum limit of 2.5 foot candles has been applied to all requests since the update of the Design Guidelines in 2011.
Staff recommends APPROVAL of a waiver from the Design Guidelines to allow an increase in intensity of lighting for the canopy for the drive-thru and ATM area in order to be in compliance with the ATM Act for 24-hour banking.
Staff recommends APPROVAL of the request for a Certificate of Appropriateness for a building permit, subject to the following conditions:
1) Revising the site lighting plan to meet the Design Guidelines lighting intensity standards based on the TTCDA Board's action on the lighting plan.
2) Vehicular access to the site is limited to access to the extension of Century Park Blvd. and a single access out to Sherrill Blvd.
3) Implementation by the developer (Pellissippi Dutchtown General Partnership) of any recommended improvements identified in the Traffic Impact Study prepared by Cannon & Cannon Inc., dated November 28, 2017 and as revised and approved by the City of Knoxville Department of Engineering, Knox County Department of Engineering and Public Works and Planning Commission staff. The improvements shall be installed to the standards and schedule as approved by the City of Knoxville Department of Engineering and Knox County Department of Engineering and Public Works.
4) Installing the sidewalks as identified on the Site Layout Plan meeting the requirements of the Knoxville Department of Engineering and the Americans with Disabilities Act (ADA) requirements. The Knoxville Department of Engineering may approve a 10' wide asphalt sidewalk or greenway in-lieu-of the 5' wide concrete sidewalk.
5) Working with the Knox County Parks Planning & Development Manager on the possible greenway route for the Knox to Oak Ridge Greenway through the Century Park Development.
6) Installing all landscaping as identified on the landscape plan within six months of the issuance of an occupancy permit for this project.
7) Meeting all applicable requirements of the Knoxville Department of Engineering.
8) Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
9) Meeting all applicable requirements of the Knoxville Zoning Ordinance.
Details of Action
DENY the waiver from the Design Guidelines to increase the maximum light intensity limits for the parking lot lighting from 2.5 foot candles to the limits shown on the photometric plan. The maximum limit of 2.5 foot candles has been applied to all requests since the update of the Design Guidelines in 2011.
APPROVE the waiver from the Design Guidelines to allow an increase in intensity of lighting for the canopy for the drive-thru and ATM area in order to be in compliance with the ATM Act for 24-hour banking.
APPROVE the request for a Certificate of Appropriateness for a building permit, subject to the following conditions:
1) Revising the site lighting plan to meet the Design Guidelines lighting intensity standards based on the TTCDA Board's action on the lighting plan.
2) Vehicular access to the site is limited to access to the extension of Century Park Blvd. and a single access out to Sherrill Blvd.
3) Implementation by the developer (Pellissippi Dutchtown General Partnership) of any recommended improvements identified in the Traffic Impact Study prepared by Cannon & Cannon Inc., dated November 28, 2017 and as revised and approved by the City of Knoxville Department of Engineering, Knox County Department of Engineering and Public Works and Planning Commission staff. The improvements shall be installed to the standards and schedule as approved by the City of Knoxville Department of Engineering and Knox County Department of Engineering and Public Works.
4) Installing the sidewalks as identified on the Site Layout Plan meeting the requirements of the Knoxville Department of Engineering and the Americans with Disabilities Act (ADA) requirements. The Knoxville Department of Engineering may approve a 10' wide asphalt sidewalk or greenway in-lieu-of the 5' wide concrete sidewalk.
5) Working with the Knox County Parks Planning & Development Manager on the possible greenway route for the Knox to Oak Ridge Greenway through the Century Park Development.
6) Installing all landscaping as identified on the landscape plan within six months of the issuance of an occupancy permit for this project.
7) Meeting all applicable requirements of the Knoxville Department of Engineering.
8) Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
9) Meeting all applicable requirements of the Knoxville Zoning Ordinance.